Location: East Point, Georgia | 2006Project area: 600,200 SF | Status: Unbuilt
Related Companies:
Speculative expansion to an existing tilt-up-concrete cross-dock distribution center. The enlarged building includes 1,257,410 SF and includes 189 dock doors with 32-foot clear height.